In this article, we are sending you new images from the Amber Forest construction site, as well as a retrospective of recent events.

THE EVOLUTION OF THE PROJECT IN PICTURES

The project is advancing according to the strategic plan assumed by the developer together with the general contractors as you will find the information in the images below:

*The Photo Gallery includes only part of the project status on March 2023. Amber Forest being developed in parallel, it is difficult to accurately capture all the areas where the entire units and infrastructure are under construction.

See mor photos

 

STATUS OF THE AUTHORIZATIONS FOR EACH CONSTRUCTION STAGE AND PHASE

  • Phase 1, Stage 1, 2 and 3:
    Have been obtained the building permits for 191 green homes.
  • Phase 1, Stage 4:
    Have been obtained the building permits for 54 green homes.
  • Phase 2:
    Have been obtained the building permits for 11 green homes.

INFRASTRUCTURE

The first layer of asphalt for the main public street of the complete suburb Amber Forest has been poured.

This public road crosses the entire project and connects Bucharest Ring Road and 1 Decembrie Tunari Street. 

Thus, the Amber Forest project has quick access to 4 roads: Strada 1 Decembrie Tunari, DN1, Highway A3, Bucharest Ring Road.

  • 🛣 2nd category public road
    🛣 two traffic lanes in each direction
    🛣 total width 20,4 m
    🛣 the width of each lane is 3.50 m
    🌳 median green space with a width of 1.0 m
    🌲 green space on one side and the other of the street with a width of 1.50 m
    🏃 pedestrian circulations of 1.20 m width
    🛣 all utilities already installed in the road underground: water; storm water, sewage, electricity, gas, fiber optic

For this section, the layers of sand, ballast and stabilized ballast were made, and the 3 layers of asphalt will be executed.

ALESONOR at CEO NETWORKING FORUM 2023

Alex Skouras, Managing Partner at Alesonor, was a speaker in the Panel dedicated to the Residential market for discussions on the latest developments and trends in the real estate sector and ways to build a sustainable future for Romania.

ALEX SKOURAS, ALESONOR MANAGING PARTNER INVITED TO THE FRAMEWORK OF THE ZF CONFERENCE ON RESIDENTIAL TRENDS ’23, ORGANIZED BY THE FINANCIAL NEWSPAPER

ALEX SKOURAS & LEONIDAS ANASTASOPOULOUS, CO-FOUNDERS & MANAGING PARTNERS AT ALESONOR, SPEAKERS AT THE SUSTAINABILITY MEETS PROFITABILITY EVENT

𝗦𝘂𝘀𝘁𝗮𝗶𝗻𝗮𝗯𝗶𝗹𝗶𝘁𝘆 𝗠𝗲𝗲𝘁𝘀 𝗣𝗿𝗼𝗳𝗶𝘁𝗮𝗯𝗶𝗹𝗶𝘁𝘆 event organized by French Tech Bucharest in collaboration with Romania-Insider.com brought together top managers in large companies, startup founders and experts who shared their experience on how sustainability can benefit the bottom line for businesses in Romania.

Alex Skouras, our Managing Partner, was speaker in the 1st panel for discussions on sustainability in businesses and ways to build a brighter and more sustainable future for Romania.

 Leonidas Anastasopoulos, Managing Partner Alesonor Real Estate Development was also speaker at the event  where he shared our company’s vision to create unique green projects that improve people’s lives.